# A Haslab two in the box post...

**URL:** <https://forum.gbfans.com/t/a-haslab-two-in-the-box-post/15821>\
**Category:** Ghost Traps\
**Created:** [March 17, 2024, 11:46am UTC](https://forum.gbfans.com/t/a-haslab-two-in-the-box-post/15821 "2024-03-17T11:46:20Z")\
**Posts on this page:** 4\
**Page:** 1

<div class="post-metadata">

**Author:** ![GBDRE760](https://forum.gbfans.com/letter_avatar_proxy/v4/letter/g/b77776/32.png) [@GBDRE760](https://forum.gbfans.com/u/GBDRE760)\
**Post date:** [March 17, 2024, 11:46am UTC](https://forum.gbfans.com/t/a-haslab-two-in-the-box-post/15821/1 "2024-03-17T11:46:20Z")

</div>

Hey guys, I know that when the Haslab [Proton Pack](https://www.gbfans.com/wiki/equipment/proton-pack) shipped out, it actually did ship ahead of schedule, I believe. Does anybody believe that it could happen again with the trap and [PKE meter](https://www.gbfans.com/shop/mattel-pke-meter)? I also realized that Haslab hasn’t given us any updates on it since around the time that the campaign closed.

---

<div class="post-metadata">

**Author:** ![one-time](https://forum.gbfans.com/user_avatar/forum.gbfans.com/one-time/32/187068_2.png) [@one-time](https://forum.gbfans.com/u/one-time)\
**Post date:** [March 17, 2024, 2:17pm UTC](https://forum.gbfans.com/t/a-haslab-two-in-the-box-post/15821/2 "2024-03-17T14:17:41Z")

</div>

Hopeful thinking would indicate maybe?

1. The processes, supply chain, etc. were already established with the Haslab Spengler’s [Proton Pack](https://www.gbfans.com/wiki/equipment/proton-pack). So we could theoretically take that off the production time.

2. The trap and PKE in terms of injection molding are relatively simple (a retainer + box and a single form hand held device) in comparison to the proton pack, which was a very complex multi-element modular product. So could be simpler to produce.

Those two facts may indicate we could see a repeat of the early release.

Although I have no idea how complex any trap+PKE combined play features (EMF programming?) will be which could add a chunk of time. Let alone any other franchise products that Hasbro may have going on which would influence the production timeline.

---

<div class="post-metadata">

**Author:** ![GBDRE760](https://forum.gbfans.com/letter_avatar_proxy/v4/letter/g/b77776/32.png) [@GBDRE760](https://forum.gbfans.com/u/GBDRE760)\
**Post date:** [March 18, 2024, 8:46am UTC](https://forum.gbfans.com/t/a-haslab-two-in-the-box-post/15821/3 "2024-03-18T08:46:20Z")

</div>

> [@One time](#):
>
> Hopeful thinking would indicate maybe?
> 
> 1. The processes, supply chain, etc. were already established with the Haslab Spengler’s Proton Pack. So we could theoretically take that off the production time.
> 
> 2. The trap and PKE in terms of injection molding are relatively simple (a retainer + box and a single form hand held device) in comparison to the proton pack, which was a very complex multi-element modular product. So could be simpler to produce.
> 
> Those two facts may indicate we could see a repeat of the early release.
> 
> Although I have no idea how complex any trap+PKE combined play features (EMF programming?) will be which could add a chunk of time. Let alone any other franchise products that Hasbro may have going on which would influence the production timeline.

I sure hope you are right. I would hope that the challenge of making these wouldn’t be much but also, the thing to consider is that the [proton pack](https://www.gbfans.com/wiki/equipment/proton-pack) didn’t exactly have moving parts like the trap and [pke meter](https://www.gbfans.com/shop/mattel-pke-meter). I just wish Haslab would give us an update, considering the fact that the movie is pretty much here.

---

<div class="post-metadata">

**Author:** ![oidoglr](https://forum.gbfans.com/user_avatar/forum.gbfans.com/oidoglr/32/182463_2.png) [@oidoglr](https://forum.gbfans.com/u/oidoglr)\
**Post date:** [March 18, 2024, 4:26pm UTC](https://forum.gbfans.com/t/a-haslab-two-in-the-box-post/15821/4 "2024-03-18T16:26:50Z")

</div>

They’re on time so long as they begin shipping out before Dec 21.
